If your business performs construction, excavation, or utility work in the City of Franklin’s public right-of-way — streets, sidewalks, or grass strips — you’ll need a Right of Way permit, and most contractors must post a surety bond as part of that permit. The bond amount is set by the city based on the scope of your work, commonly starting around $10,000 for contractor-related permits. It guarantees you’ll follow city ROW regulations and properly restore any public property your work affects. Estimated cost runs from around $150/year for strong credit profiles, with same-day approval available for most applicants.
Gary Swiftbonds, nationally recognized expert in surety bonds, bid bonds, and performance bonds.
Updated August 2026

Get An Instant Quote on City of Franklin, TN – Right of Way Bond Now
What Is the City of Franklin, TN – Right-of-Way Bond?
The City of Franklin requires a permit for any obstruction in or on the city’s right-of-way — defined as streets, sidewalks, grass strips, and similar public areas (private streets are the one exception). Contractors and subcontractors doing this kind of work within city limits must obtain a ROW permit, and most permits require a surety bond.
The bond is a financial guarantee that the contractor will:
- Follow all City of Franklin right-of-way regulations
- Properly restore public property after completing the work
- Repair any damage caused during construction
- Pay any fines, fees, or costs the city assesses for non-compliance
If the contractor fails to meet these obligations, the city can file a claim against the bond. The surety pays valid claims, and the contractor reimburses the surety in full — the bond protects the city and the public, not the contractor.
Franklin ROW Bond Amount and How It’s Set
Franklin’s Street Department sets the required bond amount based on the scope of work being performed rather than a single fixed citywide number. For general contractor-related permits in Franklin, $10,000 is a common starting point — the same amount used for the city’s related Lot Bond. Larger or higher-risk excavation and utility work can require a higher amount.
Because the exact figure depends on your specific project, always confirm your required bond amount with Franklin’s Streets Department (615-791-3254) before applying.
How Much Does the Franklin ROW Bond Cost?
You pay a small annual premium, not the full bond amount — the surety company backs the bond, and your premium is based on credit.
| Credit Profile | Estimated Annual Premium (for a $10,000 bond) |
|---|---|
| Excellent credit (700+) | ~$150/yr (about 1.5% of bond) |
| Good credit (650–699) | $200 – $400/yr |
| Fair/challenged credit (below 650) | $400 – $1,000/yr |
These are typical industry ranges for a bond this size — get an exact quote once your required bond amount is confirmed with the city, since a larger bond amount raises the dollar cost proportionally even at the same premium percentage.
Who Needs a Franklin Right-of-Way Bond?
- General contractors performing construction that affects streets, curbs, sidewalks, or easements
- Utility contractors installing or repairing water, sewer, gas, electric, fiber, or telecom lines in the right-of-way
- Excavation contractors digging, trenching, or excavating in or near public streets or sidewalks
- Paving and concrete contractors working on roadways, driveway connections, sidewalks, or public concrete structures
- Developers and site work contractors whose subdivision improvements or new development require right-of-way access
- Private utility, telecom, or broadband companies installing facilities within public right-of-way areas
How to Apply for a Franklin ROW Permit and Bond
- Confirm the bond requirement and amount with Franklin’s Streets Department — verify whether a bond applies to your project, the required amount, and any city-specific bond wording.
- Choose a licensed Tennessee surety provider like Swiftbonds and provide basic business and contractor information.
- Complete the bond application, including your legal business name, contractor license info (if applicable), owner/officer details, project details, and credit information for underwriting.
- Receive your premium quote — most ROW bonds only require a soft credit check.
- Pay the premium and receive your bond — issuance is often same-day for qualified applicants, ready to submit with your ROW permit application.
Related Tennessee Right-of-Way and Excavation Bonds
If you work across multiple Tennessee municipalities, you may also need:
- City of Germantown, TN – Right of Way Permit Bond
- Town of Nolensville, TN – Right of Way Permit Bond
- City of Bolivar, TN – Excavation Permit ($10,000) Bond
- Chattanooga, TN – Street Obstruction and Excavation ($25,000) Bond
See our full list of Tennessee license and permit bonds for more city-specific requirements.
Frequently Asked Questions
What is a Right of Way Bond in Franklin, TN?
It’s a surety bond required as part of Franklin’s ROW permit process, guaranteeing that contractors working in city streets, sidewalks, or public easements will follow city regulations and properly restore any public property affected by their work.
How much does a Franklin ROW bond cost?
Estimated premiums start around $150/year for strong credit on a typical $10,000 bond, generally about 1.5%–10% of the required bond amount depending on credit.
How long does approval take?
Bond issuance is often same-day for qualified applicants once the application and credit review are complete.
When is a ROW bond required?
Whenever construction, excavation, or utility work will obstruct or affect the city’s right-of-way — streets, sidewalks, curbs, or easements — a permit and, in most cases, a bond are required before work begins.
Ready to Work in Franklin’s Right-of-Way?
The City of Franklin, TN Right-of-Way Bond keeps your permit moving and protects public infrastructure while you work.